Reject quantities that were noted by hand or estimated, and reports that took hours to produce every time: on this basis, NORMBAU could not form a reliable quality KPI, let alone an exact OEE. To change this, the company started the step-by-step digitalization of its production back in 2010. A year later, the first FASTEC 4 PRO modules were running company-wide. This customer story shows how NORMBAU expanded its use to further modules over 15 years, thereby making all relevant data digitally capturable and evaluable.

Download Success Story

  • Industry: Plastic Processing
  • Goal: Station by station toward fully digitalized production
  • In Use: FASTEC 4 PRO software solution with the MDA, PDA, Maintenance, Detailed Scheduling, Alerting, Monitoring, Document Display, and Personnel Availability Planning modules and additional functions  

Initial Situation: High Effort from Manual Data Acquisition and Evaluation

Manual data acquisition and evaluation led to an extreme amount of time and effort at NORMBAU. For example, production control needed five to seven days each month to evaluate relevant data from production, which was then used for a 30-minute meeting.Personnel recorded rejects using tally sheets; on fully automatic machines, the reject quantity was merely estimated. These manually recorded or estimated rejects were entered into Excel together with shift reports and evaluated by quality assurance. These evaluations formed the basis for quality KPIs. In 2008, the requirement arose to regularly calculate the OEE metric (Overall Equipment Effectiveness). Due to manual data acquisition, this was a very labor-intensive calculation at NORMBAU, involving a great deal of manual paperwork.

About NORMBAU

  • Founded as a family-owned company in 1954
  • Manufacturer and global supplier of high-quality, accessible product ranges and architectural hardware
  • Part of the Allegion Group since 2013

flexible, modular, customizable : Our Solution for NORMBAU: FASTEC 4 PRO MES Software

The modular software solution FASTEC 4 PRO supports the optimization of the entire production process.

It improves production planning, provides more transparency and structured workflows, and delivers KPIs, analyses, and reports. It is industry-independent and flexibly adaptable to special production processes.

Building on the Basic Module, the six main modules can be combined with one another according to individual requirements and supplemented with various add-ons. In doing so, the individual modules access a shared, unified database. As a result, consistent data is available at all times: there are no additional interfaces between the modules and no duplicate data storage.
 

Modules Used:

  • MDA
  • PDA
  • Maintenance

Add-ons:

  • Detailed Scheduling
  • Alerting
  • Monitoring
  • Document Display
  • Personnel Availability Planning

At the start of the MES rollout, orders were still registered manually, which, however, proved to be very labor-intensive and error-prone. The switch to automatic order registration was therefore made quickly. Barcodes generated from the ERP system can now be scanned at the terminal or at the machine.

The View Client of the Monitoring add-on is also in use. The current production states is always displayed clearly on large screens in manufacturing. In particular, work centers, items, target and actual quantities, OEE, current progress, quality in percent, and the current state are shown. To provide an overview of the entire production process, an automatic page change is integrated.

Step-by-Step Expansion of the FASTEC 4 PRO MES

2013: Digital Document Management, Order-Related Production Documents Directly at the Terminal

Previously, NORMBAU maintained 1,500 order folders for 1,600 different items manually, which involved a high level of personnel and time investment that was costly, inflexible, and hard to keep track of.

With the introduction of document management, all documents contained were digitalized with FASTEC 4 PRO, and new content can since then be entered directly into the database. Furthermore, all required production documents are available by order, directly at the terminal. The depth of access can be flexibly configured here, so that either everything, only the current order/item, or only the current operation is displayed.

In addition, work and inspection instructions, photos, drawings, etc. related to the order and operation can be called up digitally at any time. This makes enormous time savings possible, along with increased flexibility through faster availability of information.

2015: Maintenance Module Enables Evaluation and Documentation of Maintenance via Various KPIs

Downtimes that occurred were also previously documented by hand by the shift supervisor. The maintenance technician recorded these locally in a document, including the downtime description, reason, and corrective action.

To make this process more efficient, the MES at NORMBAU was to be extended with the Maintenance module. Maintenance proposals, plans, and orders were to be recorded and managed centrally. In addition, it was to be possible to plan maintenance for machines, injection molds, and peripheral equipment using operations specifically set up for this purpose.

Since the introduction of the Maintenance module, evaluations of maintenance work per machine have been captured and documented via various KPIs. In particular, the number of repairs per work center over the course of a year, as well as the total duration of repairs, are recorded monthly and annually.

2019: Optimized Scheduling with FASTEC 4 PRO Modules as the Key to Success

Detailed Scheduling

Before Detailed Scheduling was integrated into FASTEC 4 PRO, production control created injection molding orders manually in the ERP system, printed them out, and scheduled them using the production folder at the planning board. The folder then traveled to the injection molding department, where the team lead assigned the planning documents to the machines. After the order was finished, the setter filed the document back, and whenever tools were changed, the folder had to be re-sorted: a completely manual process.

For Detailed Scheduling with FASTEC 4 PRO, NORMBAU therefore defined a requirements specification with the following goals: less scheduling effort, more transparency, fewer setup operations due to color and tool changes, the elimination of analog planning boards, and taking the capacity of planning resources and equipment into account. The main challenge was the high level of complexity: quantities ranging from 10 to 20,000 per order, 10,600 items in eleven colors, as well as numerous one- or two-part tools with varying production dependencies.

Since 2019, thanks to FASTEC 4 PRO, NORMBAU has used a freely configurable tooltip for every scheduling order, which displays order data, deadlines, and further information with a click of the mouse. Production proposals are transferred into the system each morning, so that scheduling can take place directly based on them.

Personnel Availability Planning

Before personnel availability planning was integrated into FASTEC 4 PRO, personnel were scheduled using an Excel document. Setters were scheduled every Friday for the following week, and machine operators were scheduled from day to day.

The shift leader of the early shift planned the late shift, and vice versa. The requirements for the personnel planning project with FASTEC were therefore reduced scheduling effort and consistent transparency.

Today, thanks to FASTEC 4 PRO, employees' names, shifts, and functions are recorded digitally and displayed in a Gantt chart.

Result: OEE Increase of Almost 30% and a 90% Reduction in Writing Effort

  • OEE increase of almost 30%
  • Reduction of rejects through identification of problem items
  • Simplified approach to repairs/maintenance, easing the burden on plant maintenance
  • 90% reduction in writing effort
  • Introduction of order scheduling with a five-day planning horizon
  • Identification and elimination of countless downtime reasons

Some older machines were replaced with more productive, new machines. With the help of FASTEC 4 PRO, power consumption in kWh is measured via counters.Data can be evaluated by order, machine, and building. Through this data acquisition, optimization measures, such as insulating the heater bands, could be implemented. In this way, significant energy savings were achieved through the data from the MES. For NORMBAU, this is a major success.

Jonas Drees
Head of Business Development
Telefon +49 5251 1647-0

Contact Us!

We are available to answer any questions you may have about MES, OEE optimization, and digital data acquisition in plastics processing.

Contact Us

Request Download!